#8 - 1225 East Keith Road, North Vancouver, British Columbia, V7J 1J3,
Canada,
Tel: (604) 986-7723, Fax: (604) 986-7734
|
          
|
|
Engineering Services for the
Bailey Road Landfill Phase II
Expansion
District of
Chilliwack
-
District of Chilliwack is
expanding the existing landfill up-slope to provide 9 years of
extra capacity, valued at $17 million.
-
Design drawings, tender
specifications and construction inspection provided by SHA and
Thurber Engineering.
-
Engineering design included
leachate collection system, groundwater interception system,
surface water diversion system and earthworks.
-
Slope design involved protecting
Teskey Way, a new road constructed by the District of Chilliwack
directly up-slope of the landfill.
District of Chilliwack Contact: Phil Blaker Project
Budget $55,000
Return to Case
Histories
| |